Book a consultationBook

Case StudiesPrecision hardware manufacturer and exporter

Three times the products in the catalog.

How a precision hardware manufacturer and exporter turned CAD files into renders, technical documents and catalog pages, with engineers reviewing before release.

Client
Precision hardware manufacturer and exporter
Team
R&D and engineering
Inputs and systems
CAD files, BOM tables, product specifications

The bottleneck

New products waited months for their catalog pages.

Every new product needed renders, technical sheets and catalog pages produced by hand from CAD files, so new lines took months to reach buyers.

The engineering team’s time went into documentation instead of design, and buyers saw new lines late.

What we built.

A pipeline from CAD to finished documentation, in three outputs and one review.

  1. 01

    Product renders

    CADFitting_range.step
    Renders for every model

    Renders generated from the confirmed CAD models.

  2. 02

    Technical documents

    PDFSpec_sheet_EN.pdfPDFManual_DE.pdf

    Spec sheets and manuals generated from CAD and BOM data.

  3. 03

    Catalog pages

    Catalog pageRenders + technical data
    Assembled

    Catalog pages assembled from the renders and the technical data.

  4. 04

    Engineering review

    Checked by engineering
    Released to buyersRenders, documents, pages
    Live

    Engineers check every render and document before it is released to buyers.

What changed.

−97%rendering cost
3×SKU throughput
“Our engineers design, and the catalog follows. New products reach our buyers while they are still new.”
— Head of Engineering, Precision hardware manufacturer and exporter

Where it fits

The same pattern fits any catalog built from engineering data.

Components, fittings or equipment: generate the renders, sheets and pages from the source files, and keep engineers as the final check.

More

Have a similar bottleneck?

Test the pattern on a small batch of your own past files before you commit to a full build.

  • The process most likely to pay back first
  • A realistic view of time and cost saved
  • A plan to go live in four to six weeks

No commitment. You’ll speak with an implementation lead, not a sales script. Or email us.

What would you like help with? (optional)

Or send us the full brief →