Case StudiesManufacturing
From drawings to quotes, from CAD to catalog.
AI workflows for precision parts, hardware and fabrication plants. They take the paperwork out of engineering and the shop floor, without replacing your ERP.

Where paperwork slows quotes, launches and lines.
Slow quotes from drawings
Engineers spend days reading customer drawings and searching old folders to price one enquiry.
Catalogs and compliance
New products wait months for renders, English manuals and CE or CBAM document packs.
Shop-floor and QA admin
Technicians search binders during a fault, and quality engineers check certificates and type 8D reports by hand.
From the engineering desk to the plant floor.
Three workflows connected to the files you already have.

Costing and spec checks from drawings
Customer drawings and technical agreements are read, past routings referenced, and a costing and compliance checklist prepared.
CAD to catalog
Confirmed CAD models and BOM tables become product renders, multilingual spec sheets and catalog pages.
Shop-floor answers and QA drafts
Operators get cited answers on a tablet, supplier certificates are checked against tolerances, and NCR or 8D reports are drafted.
From our clients.

Three times the products in the catalog.
1×3×
SKU throughput
A pipeline from CAD files to renders, technical documents and catalog pages, reviewed by engineers before release.
Read the case study →Answers from production data in a third of the time.
60 mins20 mins
Per management query
Managers ask about output and order status across departments and get answers from the production data exports.
Read the case study →Works with the files and systems you have.
No new systems for the plant.
Works with
- CAD / BOM exports
- Drawing archives
- ERP
- MES
- Plant tablets
- SharePoint
From drawing to report
Costing, catalog and quality drafts are built from your own drawings, routings and procedures.
Your files, your site
CAD and BOM exports, drawing archives, ERP or MES tables and plant tablets, with on-premise options for sensitive designs.
Pick one engineering or shop-floor bottleneck.
Show us how your team handles drawings, catalogs or quality documents today. We will map a focused four-to-six-week sprint.
- The process most likely to pay back first
- A realistic view of time and cost saved
- A plan to go live in four to six weeks
No commitment. You’ll speak with an implementation lead, not a sales script. Or email us.
