Case StudiesTesting laboratory, China
Certificates of analysis without the retyping.
How a pharmaceutical testing laboratory connected the outputs of its instruments to its reports, so scientists check results instead of typing them.
- Client
- Pharmaceutical testing laboratory, China
- Team
- Laboratory analysts and reporting
- Inputs and systems
- HPLC systems, dissolution testers and spectrometers (CSV, PDF and paper printouts), the master report and LIMS

The bottleneck
Scientists typing results line by line.
HPLC systems, dissolution testers and spectrometers all produced results in different formats: CSV files, PDFs and paper printouts.
To issue one certificate of analysis, scientists gathered every output and typed the results into a single report. Each keystroke was a risk on a compliance document, and reports were finished hours after testing ended.
What we built.
Document processing built for the lab, without replacing any instrument.
- 01
Any instrument, any format
Outputs are read from every source, from the scanned PDF of an older instrument to a direct data file.
- 02
Read in context
The model recognises lab parameters such as retention time, absorbance and purity, wherever they appear on the page.
- 03
The report assembled
Extracted values fill the master report or the LIMS automatically, each linked back to its source document.
What changed.
“Our reporting process used to be the most stressful part of the day. We were terrified of making a typo on a compliance document. The AI pulls data from our oldest machines just as easily as the new ones. Our scientists are back to doing science, not data entry.”

Where it fits
The same pattern fits any team that retypes machine output into reports.
Quality labs, inspection services or production lines: read the outputs as they are, assemble the report and keep a trail back to every source.
Have a similar bottleneck?
Test the pattern on a small batch of your own past files before you commit to a full build.
- The process most likely to pay back first
- A realistic view of time and cost saved
- A plan to go live in four to six weeks
No commitment. You’ll speak with an implementation lead, not a sales script. Or email us.


